Logs arrive as part of Alki Homestead restoration
Thu, 05/28/2015
information from Southwest Seattle Historical Society
Fifteen fir logs arrived in the Alki Homestead parking lot Thursday afternoon, May 28, awaiting use in replacing damaged logs in the southeast corner of the building.
The logs are stored in a trailer that owner Dennis Schilling drove from Mountain Log Homes in Kalama, north of Portland. Each log is about 16-1/2 feet long.
Schilling said work will begin soon on shoring up the interior of the southeast corner of the Homestead to allow eventual replacement of damaged logs that have been marked for several months with blue tape.
In preparation for this work, Schilling’s crew installed anchor fence to surround the front entrance of the Homestead as a protective measure.
There is no set schedule for the log replacement, but some of the work may begin by the time of a group photo to be taken of 900 students from Alki and Schmitz Park elementary schools the morning of Friday, June 5, 2015. As part of the brief event, speakers will include King County Executive Dow Constantine and Seattle City Council member Tom Rasmussen.
Schilling has been consulting with a structural engineer, and his crew has installed temporary power and begun cleaning out non-landmarked, fire-damaged materials from the kitchen. Soon his crew will measure roof angles in preparation for repair, along with eventual restoration of the iconic Alki Homestead sign.