Don Armeni Boat Ramp replacement project; Ramp closed Nov. 7 for float removal
Information from Seattle Parks and Recreation
For safety reasons, the contractor for the Don Armeni Boat Ramp Replacement project, Bellingham Marine Industries (BMI), will remove all the concrete floats except those connected to the abutment on both the north and south side at Don Armeni Boat Ramp on Thursday, November 7, 2024. The boat ramp opened in March 2024 and over the past 8 months the hinges between the floats have been failing and the concrete on the floats is spalling and cracking.